A lakeside leadership campus with 262 large glass louvers following a continuous S-shaped architectural geometry.

Petronas New Leadership Campus
20,000 m²Curtain Wall Area
CompletedStatus
Sunway Construction Sdn. Bhd.Main Contractor
Bangi, SelangorLocation
01 / Project Context

Built for
its place.

An executive training and leadership campus for Petronas. The lakeside development is organised as a continuous S-shaped sequence of courtyards within an ecological landscape, with photovoltaic panels arranged across the roofs.

Facade Scope

Glass rainscreens; aluminium louvers; glass canopies; skylights; framed curtain walls; glass doors; glass louvers; frameless glass curtain walls; aluminium column cladding.

02 / Engineering Highlights

Envelope
logic.

The primary elevations incorporate 262 large glass louver assemblies distributed along the S-shaped building geometry. Each louver assembly is approximately 9.5 m high, with the upper 2.6 m projecting outward to form a canopy. Steel supporting frames were prefabricated in the factory and lifted into position as complete assemblies.

04 / Delivery

From design
to built work.

01Design Coordination
02Engineering
03Fabrication
04Installation