Home/ Projects/ TNB HQ Campus Phase II
Case Study / Malaysia / 01

TNB HQ
Campus Phase II.

A GBI Platinum office campus combining unitized glazing, adjustable perforated-aluminium sunshades and extensive curved facade conditions.

TNB HQ Campus Phase II
68,000 m²Curtain Wall Area
CompletedStatus
Sunway Construction Sdn. Bhd.Main Contractor
Bangsar, Kuala LumpurLocation
01 / Project Context

Built for
its place.

Phase II of the Tenaga Nasional Berhad headquarters campus. The development is positioned as a GBI Platinum green building and comprises four towers of varying heights (7–19 storeys), supported by a conference-centre cluster.

Facade Scope

Unitized framed curtain wall; perforated shaped sunshade fins; glass balustrades; glass canopies.

02 / Engineering Highlights

Envelope
logic.

One of the few large-scale Malaysian high-rise office clusters to use laminated insulated glass and ultra-clear laminated insulated Low-E glass extensively. Each floor is equipped with boomerang-shaped perforated aluminium sunshade fins with adjustable angles. Building corners incorporate large areas of curved laminated insulated glass together with curved sunshade fins. The fins were developed through 3D modelling and aluminium welding, while extensive stretch-bent curved components create the flowing facade.

04 / Delivery

From design
to built work.

01Design Coordination
02Engineering
03Fabrication
04Installation